Cross-border interconnection of electrical power markets and the need for policy coordination

Descripción del Articulo

The interconnection of two power grids creates a need for new regulation policies to govern it, as many factors are involved when two markets become interconnected and the policies of each country are designed only for its internal power market. It is therefore necessary to find the best mechanism f...

Descripción completa

Detalles Bibliográficos
Autores: Jara Caytuiro, Fabiola, Luyo Koung, Jaime, Rios, Alberto
Formato: artículo
Fecha de Publicación:2018
Institución:Universidad Nacional de Ingeniería
Repositorio:Revista UNI - Tecnia
Lenguaje:español
OAI Identifier:oai:oai:revistas.uni.edu.pe:article/590
Enlace del recurso:http://www.revistas.uni.edu.pe/index.php/tecnia/article/view/590
Nivel de acceso:acceso abierto
Materia:Interconexión
mercado de electricidad
políticas de regulación
simulación
complementariedad
id 0375-7765_11b95b111cc0fcd2f3e6577ae65086ac
oai_identifier_str oai:oai:revistas.uni.edu.pe:article/590
network_acronym_str 0375-7765
repository_id_str .
network_name_str Revista UNI - Tecnia
spelling Cross-border interconnection of electrical power markets and the need for policy coordinationInterconexión de mercados transfronterizos de electricidad y la necesidad de políticas de coordinaciónJara Caytuiro, FabiolaLuyo Koung, JaimeRios, AlbertoInterconexiónmercado de electricidadpolíticas de regulaciónsimulacióncomplementariedadThe interconnection of two power grids creates a need for new regulation policies to govern it, as many factors are involved when two markets become interconnected and the policies of each country are designed only for its internal power market. It is therefore necessary to find the best mechanism for interconnecting both markets, which will also ensure that both countries share the benefits and costs. Issues like the contribution of large hydroelectric plants with reservoirs, the implementation of unconventional renewable energy sources and the effect of both on the complementarity and integration of cross-border power markets; all are problems that have no general solution and have to be solved for each particular case.La interconexión de dos mercados eléctricos necesita nuevas políticas de regulación que la rijan, porque hay diversos factores que se involucran cuando se interconectan dos mercados, ya que las políticas del mercado de electricidad de cada país están diseñadas para su mercado interno, por lo que existe la necesidad de determinar cuál es el mejor mecanismo para la interconexión de ambos mercados, tratando que ambos países compartan los beneficios y los costos. Estudiar el impacto de la participación de grandes centrales hidroeléctricas con embalse y el efecto que tendrán en la complementariedad de los mercados eléctricos transfronterizos; la implementación de RER no convencionales y como afectaran en la integración de los mercados eléctricos transfronterizos, son problemas que no tienen soluciones generales y que deben tratarse para cada caso específico.Universidad Nacional de Ingeniería2018-12-18info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionElectrical Engineering and Power SystemsIngeniería Eléctrica y Sistemas de Potenciaapplication/pdfaudio/mpegtext/plainhttp://www.revistas.uni.edu.pe/index.php/tecnia/article/view/59010.21754/tecnia.v28i2.590TECNIA; Vol 28 No 2 (2018)TECNIA; Vol. 28 Núm. 2 (2018)2309-04130375-7765reponame:Revista UNI - Tecniainstname:Universidad Nacional de Ingenieríainstacron:UNIspahttp://www.revistas.uni.edu.pe/index.php/tecnia/article/view/590/574http://www.revistas.uni.edu.pe/index.php/tecnia/article/view/590/767http://www.revistas.uni.edu.pe/index.php/tecnia/article/view/590/976info:eu-repo/semantics/openAccess2021-05-29T15:55:42Zmail@mail.com -
dc.title.none.fl_str_mv Cross-border interconnection of electrical power markets and the need for policy coordination
Interconexión de mercados transfronterizos de electricidad y la necesidad de políticas de coordinación
title Cross-border interconnection of electrical power markets and the need for policy coordination
spellingShingle Cross-border interconnection of electrical power markets and the need for policy coordination
Jara Caytuiro, Fabiola
Interconexión
mercado de electricidad
políticas de regulación
simulación
complementariedad
title_short Cross-border interconnection of electrical power markets and the need for policy coordination
title_full Cross-border interconnection of electrical power markets and the need for policy coordination
title_fullStr Cross-border interconnection of electrical power markets and the need for policy coordination
title_full_unstemmed Cross-border interconnection of electrical power markets and the need for policy coordination
title_sort Cross-border interconnection of electrical power markets and the need for policy coordination
dc.creator.none.fl_str_mv Jara Caytuiro, Fabiola
Luyo Koung, Jaime
Rios, Alberto
author Jara Caytuiro, Fabiola
author_facet Jara Caytuiro, Fabiola
Luyo Koung, Jaime
Rios, Alberto
author_role author
author2 Luyo Koung, Jaime
Rios, Alberto
author2_role author
author
dc.subject.none.fl_str_mv Interconexión
mercado de electricidad
políticas de regulación
simulación
complementariedad
topic Interconexión
mercado de electricidad
políticas de regulación
simulación
complementariedad
dc.description.none.fl_txt_mv The interconnection of two power grids creates a need for new regulation policies to govern it, as many factors are involved when two markets become interconnected and the policies of each country are designed only for its internal power market. It is therefore necessary to find the best mechanism for interconnecting both markets, which will also ensure that both countries share the benefits and costs. Issues like the contribution of large hydroelectric plants with reservoirs, the implementation of unconventional renewable energy sources and the effect of both on the complementarity and integration of cross-border power markets; all are problems that have no general solution and have to be solved for each particular case.
La interconexión de dos mercados eléctricos necesita nuevas políticas de regulación que la rijan, porque hay diversos factores que se involucran cuando se interconectan dos mercados, ya que las políticas del mercado de electricidad de cada país están diseñadas para su mercado interno, por lo que existe la necesidad de determinar cuál es el mejor mecanismo para la interconexión de ambos mercados, tratando que ambos países compartan los beneficios y los costos. Estudiar el impacto de la participación de grandes centrales hidroeléctricas con embalse y el efecto que tendrán en la complementariedad de los mercados eléctricos transfronterizos; la implementación de RER no convencionales y como afectaran en la integración de los mercados eléctricos transfronterizos, son problemas que no tienen soluciones generales y que deben tratarse para cada caso específico.
description The interconnection of two power grids creates a need for new regulation policies to govern it, as many factors are involved when two markets become interconnected and the policies of each country are designed only for its internal power market. It is therefore necessary to find the best mechanism for interconnecting both markets, which will also ensure that both countries share the benefits and costs. Issues like the contribution of large hydroelectric plants with reservoirs, the implementation of unconventional renewable energy sources and the effect of both on the complementarity and integration of cross-border power markets; all are problems that have no general solution and have to be solved for each particular case.
publishDate 2018
dc.date.none.fl_str_mv 2018-12-18
dc.type.none.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
Electrical Engineering and Power Systems
Ingeniería Eléctrica y Sistemas de Potencia
format article
status_str publishedVersion
dc.identifier.none.fl_str_mv http://www.revistas.uni.edu.pe/index.php/tecnia/article/view/590
10.21754/tecnia.v28i2.590
url http://www.revistas.uni.edu.pe/index.php/tecnia/article/view/590
identifier_str_mv 10.21754/tecnia.v28i2.590
dc.language.none.fl_str_mv spa
language spa
dc.relation.none.fl_str_mv http://www.revistas.uni.edu.pe/index.php/tecnia/article/view/590/574
http://www.revistas.uni.edu.pe/index.php/tecnia/article/view/590/767
http://www.revistas.uni.edu.pe/index.php/tecnia/article/view/590/976
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
audio/mpeg
text/plain
dc.publisher.none.fl_str_mv Universidad Nacional de Ingeniería
publisher.none.fl_str_mv Universidad Nacional de Ingeniería
dc.source.none.fl_str_mv TECNIA; Vol 28 No 2 (2018)
TECNIA; Vol. 28 Núm. 2 (2018)
2309-0413
0375-7765
reponame:Revista UNI - Tecnia
instname:Universidad Nacional de Ingeniería
instacron:UNI
reponame_str Revista UNI - Tecnia
collection Revista UNI - Tecnia
instname_str Universidad Nacional de Ingeniería
instacron_str UNI
institution UNI
repository.name.fl_str_mv -
repository.mail.fl_str_mv mail@mail.com
_version_ 1701108800393576448
score 13.945474
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).