tesis de grado
Publicado 2019
Enlace
Enlace
In Minera Yanacocha for the gold mill plant, minerals are extracted from the Tapado and Yanacocha pits; but if the extraction of ore with Au has been deepened, the greater amount of Cu is also being obtained, producing a high variability in its law, the operation costs have increased due to the increase of inputs (Cyanide and lime) and the decrease Percentage in the recovery of the Au. This is the problem of the sum of the trucks that are used for the process are part of the giant fleet CAT 785 with capacity of 150 MT, which generates a mixture of thickened mineral discharge with high Cu content in the Hopper The discharge of the gold mill, so that an optimal mix has not been made, has also taken into account the entry of ore with high variability in the Cu law. In order to improve the problem, they are presented as hypothesis and a pilot plan with a 3.5m3 loading fleet and a 15 m3 capac...