Mostrando 1 - 11 Resultados de 11 Para Buscar 'Salgado Canal, Jose Antonio', tiempo de consulta: 0.15s Limitar resultados
1
artículo
The purpose was to develop a methodology for the implementation of Standard NTP ISO / IEC 17025: 2017 for the accreditation of soil, concrete and pavement testing laboratories in private universities in Peru, for which the PMBOK and the requirements of Standard NTP ISO / IEC 17025: 2017. The methodology was structured into three main components: diagnosis, management, operation and maintenance, each of which contains a group of formats structured according to the regulatory requirements to be implemented. The proposed methodology is a tool to help university laboratories that aspire to be accredited, that guarantee the quality and reliability of the tests and contribute to their management as a training, research and service center. In Peru there are few accredited laboratories of universities, a problem that is reflected in the positioning of our country in terms of quality infrastructu...
2
artículo
Infrastructure projects incorporate, as a general rule, a complex contractual structure that must respond to the needs of the project, including the risk management in the construction of the works.The objective is to develop a risk management model that improves the scope, time and cost of the direct management basic sanitation projects executed by the EPS of the Tacna Region, 2017. For this purpose, the research used is of the application type. , not experimental and quantitative. Determine the specific objectives through tools and techniques, through surveys and expert evaluation, which are processed with the Monte Carlo Method using the RiskyProject Professional Program that records the risks that are part of the scope, determines the contingency in cost and time.The risk management model to be followed responds to the good practices of the PMBOK. The application of the proposed mode...
3
artículo
The research work was carried out with the information and evaluation of executed contracts for the execution of works in the Sanitation Services Provider Entity (EPS TACNA SA) Period 2012 - 2018, this investigation has the purpose of design a contract management model to improve the project management in sanitation works in the EPS TACNA SA; During this period of execution of works by CONTRACT MODE we have been able to see an innumerable numbers of queries, contradictions, omissions, negligence; having to be acquitted by the Supervision or directly by the Project Consultant. This confusing project generates risks in the projects executed by EPS Tacna SA, which in many cases cause the investments to be affected by paralyzes, unjustified delays finally in arbitration and this implies that they do not maintain their investment cycle and therefore loss of entity. FIDIC (International Federa...
5
artículo
The purpose was to develop a methodology for the implementation of Standard NTP ISO / IEC 17025: 2017 for the accreditation of soil, concrete and pavement testing laboratories in private universities in Peru, for which the PMBOK and the requirements of Standard NTP ISO / IEC 17025: 2017. The methodology was structured into three main components: diagnosis, management, operation and maintenance, each of which contains a group of formats structured according to the regulatory requirements to be implemented. The proposed methodology is a tool to help university laboratories that aspire to be accredited, that guarantee the quality and reliability of the tests and contribute to their management as a training, research and service center. In Peru there are few accredited laboratories of universities, a problem that is reflected in the positioning of our country in terms of quality infrastructu...
6
artículo
Infrastructure projects incorporate, as a general rule, a complex contractual structure that must respond to the needs of the project, including the risk management in the construction of the works.The objective is to develop a risk management model that improves the scope, time and cost of the direct management basic sanitation projects executed by the EPS of the Tacna Region, 2017. For this purpose, the research used is of the application type. , not experimental and quantitative. Determine the specific objectives through tools and techniques, through surveys and expert evaluation, which are processed with the Monte Carlo Method using the RiskyProject Professional Program that records the risks that are part of the scope, determines the contingency in cost and time.The risk management model to be followed responds to the good practices of the PMBOK. The application of the proposed mode...
7
artículo
The research work was carried out with the information and evaluation of executed contracts for the execution of works in the Sanitation Services Provider Entity (EPS TACNA SA) Period 2012 - 2018, this investigation has the purpose of design a contract management model to improve the project management in sanitation works in the EPS TACNA SA; During this period of execution of works by CONTRACT MODE we have been able to see an innumerable numbers of queries, contradictions, omissions, negligence; having to be acquitted by the Supervision or directly by the Project Consultant. This confusing project generates risks in the projects executed by EPS Tacna SA, which in many cases cause the investments to be affected by paralyzes, unjustified delays finally in arbitration and this implies that they do not maintain their investment cycle and therefore loss of entity. FIDIC (International Federa...
8
artículo
The purpose was to develop a methodology for the implementation of Standard NTP ISO / IEC 17025: 2017 for the accreditation of soil, concrete and pavement testing laboratories in private universities in Peru, for which the PMBOK and the requirements of Standard NTP ISO / IEC 17025: 2017. The methodology was structured into three main components: diagnosis, management, operation and maintenance, each of which contains a group of formats structured according to the regulatory requirements to be implemented. The proposed methodology is a tool to help university laboratories that aspire to be accredited, that guarantee the quality and reliability of the tests and contribute to their management as a training, research and service center. In Peru there are few accredited laboratories of universities, a problem that is reflected in the positioning of our country in terms of quality infrastructu...
9
artículo
Infrastructure projects incorporate, as a general rule, a complex contractual structure that must respond to the needs of the project, including the risk management in the construction of the works.The objective is to develop a risk management model that improves the scope, time and cost of the direct management basic sanitation projects executed by the EPS of the Tacna Region, 2017. For this purpose, the research used is of the application type. , not experimental and quantitative. Determine the specific objectives through tools and techniques, through surveys and expert evaluation, which are processed with the Monte Carlo Method using the RiskyProject Professional Program that records the risks that are part of the scope, determines the contingency in cost and time.The risk management model to be followed responds to the good practices of the PMBOK. The application of the proposed mode...
10
artículo
The research work was carried out with the information and evaluation of executed contracts for the execution of works in the Sanitation Services Provider Entity (EPS TACNA SA) Period 2012 - 2018, this investigation has the purpose of design a contract management model to improve the project management in sanitation works in the EPS TACNA SA; During this period of execution of works by CONTRACT MODE we have been able to see an innumerable numbers of queries, contradictions, omissions, negligence; having to be acquitted by the Supervision or directly by the Project Consultant. This confusing project generates risks in the projects executed by EPS Tacna SA, which in many cases cause the investments to be affected by paralyzes, unjustified delays finally in arbitration and this implies that they do not maintain their investment cycle and therefore loss of entity. FIDIC (International Federa...