Mostrando 1 - 3 Resultados de 3 Para Buscar 'Pérez Fernández, Jhon Luis', tiempo de consulta: 0.02s Limitar resultados
1
tesis de grado
This research project called profile thesis entitled "STUDY ON PUBLIC ROADS IN SWEEPING CITY MOYOBAMBA 2011" is basically the study of the current state of the whole system Scanning Municipal Solid Waste that is provided in the city Moyobamba, also to have a real diagnosis of the deficiencies in the service provided by the management and also to present a list of measures which will significantly improve the service. In addition to the implementation of the project in question allowed up technical information as regards: total length of paved pathways Moyobamba is 19,659 linear feet (19.6 Km) .The Scanning service that runs in our city; basically considered urban Moyobamba part of the same amounting to 11,082.7 linear feet, which in percentage terms represents 56.4% of people who enjoy Scanning Service; the average performance of each worker sweeper is 852.51 mt / sweeper / day, approx. ...
2
tesis de grado
The present research project referred to as a profile of the thesis entitled "STUDY ON THE SWEEP OF PUBLIC ROADS IN THE MOYOBAMBA CITY 2011" is basically the study of the current situation of the municipal entire wiper system solid waste that is provided in the Moyobamba city, likewise to be able to have a royal diagnosis on the deficiencies as for the service that offers the management and simultaneously be able to present a list of measures that allows to improve significantly the service. Likewise with the execution of the project in mention it allowed to raise technical information in what it recounts tci: total length of paved roads in the Moyobamba city is 19.659 linear meters (19.6 km). The sweep service that is executed in our city; considered basically the Moyobamba urban part the same that amounts to 11.082 linear meters, which in percentage terms represents a 56.4 per cent of ...
3
tesis de maestría
ABSTRACT The present research work had the purpose of determining the impact of the implementation of an integrated process in the treatment of industrial wastewater in the agroindustrial plant CAMPOSOL S.A. in the period 2016 - 2017. To make the proposal of the treatment system, the amount of water eliminated from industrial processes was evaluated, then the status of the lagoons and their storage capacity was evaluated, determining capacity and days of storage of wastewater. After knowing the storage capacity, primary physical systems were implemented to reduce by 95% the organic solids in suspension generated from the processes, allowing to ensure an adequate treatment of wastewater with the retention of organic matter ensured by the preliminary systems, aquatic plants were introduced in the following lagoons as a pate of the biological increase, stabilizing ph parameters, total suspe...