1
artículo
Budget program 068 and reactive management in the municipality provincial of Tumbes in the year 2021
Publicado 2022
Enlace
Enlace
The objective of the research was to analyze the relationship between the Budget Program 068 and the Reactive Management in the Provincial Municipality of Tumbes in the year 2021. It is a basic type study, with a descriptive, quantitative, correlational and cross-sectional design., with a sample of 376 residents of the areas of greatest risk and 28 managers of the municipality. Two fifteen-item questionnaires for each variable were used as instruments, their reliability is good and they were validated using Cronbach's Alpha coefficient (α = 0.761 and α = 0.767, respectively). As a result of the survey, it was obtained that 43% of the municipal officials affirm that there is never a relationship between the two variables, however, the hypothesis test concludes that there is a relationship between them (X2=0.045 Pearson correlation). A conceptual model is proposed to improve programming,...
2
artículo
Publicado 2023
Enlace
Enlace
Public Budgeting Program 068 (PP068 by its Spanish initials) is part of the National System for Disaster Risk Management financial strategy and is linked to disaster risk management processes—among them, the processes of Reactive Management (GR by its Spanish initials). It enables articulated interventions between entities from the three government levels to reduce the vulnerability of the population and their means of living. The study determined the relationship between PP068 and GR based on the budget allocation for the products and actions aimed at the preparation, response and rehabilitation processes. This means that the variables have a cause and effect relationship; this is to say, a considerable budget allocation in PP068 helps to put the preparation and response procedures from reactive management into operation, resulting in value creation in municipality interventions as a ...