1
tesis de grado
Publicado 2019
Enlace
Enlace
In Cía. Minera Poderosa, this project is carried out in order to reduce the costs of extracting ore from the Rósamela and Rosaura veins, before the project is extracted on rails at levels 1915, 1800, 1600 and 1467 with electric locomotives and G-cars 60 and G-140 and Tunnel Virus The ore is transported in dumps to Marañón silver; which results in the increase of the unit costs of extraction ($ 19.9 / MT). Taking as reference this main problem, a study was made to implement a new extraction route to reduce the cost of mineral extraction, by building a Raise Boring Chimneys from level 1915 to level 1467 as Ore Pass, which will be built in a strategic zone in order to reduce the distance of travel of extraction equipment. For the study information was collected from various bibliographic sources which provide us with additional information to be able to structure our research, this info...