Mostrando 1 - 2 Resultados de 2 Para Buscar 'Mafimisebi, Ojuotimi', tiempo de consulta: 0.01s Limitar resultados
1
artículo
Insufficient institutional credit is a major contributor to the persistent poor performance of the Nigerian agricultural sector. To encourage financial institutions to increase lending to the sector, a partial credit guarantee scheme was instituted. The scheme commenced operations in 1978 with an authorized capital of N100.00 million, subscribed to 60% and 40% by the Federal Government of Nigeria and the Central Bank of Nigeria, respectively. This paper presents an appraisal of the scheme. The results revealed that there has been continuous growth in paid-up share capital, total fund resources, maximum amount of loan obtainable by farmers, number and value of loans guaranteed, volume and value of loans fully repaid and volume and value of default claims settled. There was a long-run convergence between the number and volume of guaranteed loans and the agricultural GDP. This finding indic...
2
artículo
Insufficient institutional credit is a major contributor to the persistent poor performance of the Nigerian agricultural sector. To encourage financial institutions to increase lending to the sector, a partial credit guarantee scheme was instituted. The scheme commenced operations in 1978 with an authorized capital of N 100.00 million, subscribed to 60% and 40% by the Federal Government of Nigeria and the Central Bank of Nigeria, respectively. This paper presents an appraisal of the scheme. The results revealed that there has been continuous growth in paid-up share capital, total fund resources, maximum amount of loan obtainable by farmers, number and value of loans guaranteed, volume and value of loans fully repaid and volume and value of default claims settled. There was a long-run convergence between the number and volume of guaranteed loans and the agricultural GDP. This finding indi...