The research work was carried out with the information and evaluation of executed contracts for the execution of works in the Sanitation Services Provider Entity (EPS TACNA SA) Period 2012 - 2018, this investigation has the purpose of design a contract management model to improve the project management in sanitation works in the EPS TACNA SA; During this period of execution of works by CONTRACT MODE we have been able to see an innumerable numbers of queries, contradictions, omissions, negligence; having to be acquitted by the Supervision or directly by the Project Consultant. This confusing project generates risks in the projects executed by EPS Tacna SA, which in many cases cause the investments to be affected by paralyzes, unjustified delays finally in arbitration and this implies that they do not maintain their investment cycle and therefore loss of entity. FIDIC (International Federa...
2
artículo
The research work was carried out with the information and evaluation of executed contracts for the execution of works in the Sanitation Services Provider Entity (EPS TACNA SA) Period 2012 - 2018, this investigation has the purpose of design a contract management model to improve the project management in sanitation works in the EPS TACNA SA; During this period of execution of works by CONTRACT MODE we have been able to see an innumerable numbers of queries, contradictions, omissions, negligence; having to be acquitted by the Supervision or directly by the Project Consultant. This confusing project generates risks in the projects executed by EPS Tacna SA, which in many cases cause the investments to be affected by paralyzes, unjustified delays finally in arbitration and this implies that they do not maintain their investment cycle and therefore loss of entity. FIDIC (International Federa...
3
tesis de maestría
Objetivo: Diseñar un modelo de administración de contratos para mejorar la gestión de proyectos en obras de saneamiento en la EPS TACNA S.A. todo ello desde la etapa de la licitación (convocatoria de una obra por la modalidad de contrata), pasando por la firma de contrato y la ejecución misma ya que se propone un modelo de contrato estandarizado para el buen manejo, control y seguimiento de los proyectos en ejecución. Metodología: Se ha procedido al análisis de cada uno de los contratos firmados desde los años 2012 hasta la fecha que posterior se comparó con el contrato estandarizado FIDIC, además, se realizaron encuestas y entrevistas a expertos. Resultados: se desarrolló un modelo de administración de contrato estandarizado que permitirá gestionar un proyecto de saneamiento desde la etapa inicial de la licitación, buena pro, firma de contrato, ejecución y la etapa de ci...
4
artículo
The research work was carried out with the information and evaluation of executed contracts for the execution of works in the Sanitation Services Provider Entity (EPS TACNA SA) Period 2012 - 2018, this investigation has the purpose of design a contract management model to improve the project management in sanitation works in the EPS TACNA SA; During this period of execution of works by CONTRACT MODE we have been able to see an innumerable numbers of queries, contradictions, omissions, negligence; having to be acquitted by the Supervision or directly by the Project Consultant. This confusing project generates risks in the projects executed by EPS Tacna SA, which in many cases cause the investments to be affected by paralyzes, unjustified delays finally in arbitration and this implies that they do not maintain their investment cycle and therefore loss of entity. FIDIC (International Federa...
5
artículo
The investigation had as main objective to analyze the evaluation of the structural reduction in the design of a building with seismic isolators in the district of Tacna-2021, for this research the Faculty of Architecture and Urbanism of the Private University of Tacna was analyzed, for which it was carried out based on the Peruvian Technical Standards, relying on the Dynamic Isolation Catalog for the design of Insulators, then (03) Three Modelings were performed in the Etabs V19 Software, Structural Modeling without Seismic Isolators, Structural Modeling with Seismic Isolators and Modeling with Seismic Isolators-Structural Reduction. The Descriptive Method was used, systematically describing and analyzing the existing information regarding the results obtained by modifying the current conditions of the situation. As a result, a structural reduction of 20.47m2 of the columns was obtained...