The research analyzes the results obtained from applying the geotechnical monitoring model through convergences in the conduction tunnel of the Cheves hydroelectric plant - located in the district of Churín, province of Oyón, department of Lima. The conduction tunnel is 9693 meters long; during the underground excavation process using the New Austrian Tunnel Construction Method, which integrates the principles of the behavior of rock masses subjected to loads and the monitoring of the efficiency of underground construction. In the underground excavation, the geological contact between the Casma Group and the Chimú Formation is intercepted, which was affected by the post Intrusive Churín event, which increased the areas of weakness in the Casma Formation, such as geological faults filled with expansive minerals that are dipping to the ground. inside the tunnel shaft.The initial suppor...
2
tesis de maestría
Publicado 2022
Enlace
Enlace
Analiza el impacto que se generó luego de haber aplicado el modelo de monitoreo geotécnico mediante convergencias en el túnel de conducción de la central hidroeléctrica Cheves – ubicada en el distrito de Churín, provincia de Oyón, departamento de Lima. El túnel de conducción consta de 9693 metros de longitud; durante el proceso de excavación subterránea mediante el método NATM, se intercepta el contacto Geológico entre el Grupo Casma y la Formación Chimú, que fue afectado por el evento del post Intrusivo Churín, que aumento las zonas de debilidad en la Formación Casma, como fallas geológicas rellenas de minerales expansivos que están buzando al interior del eje del túnel. El sostenimiento inicial del túnel de conducción fue definido después de haber evaluado mediante clasificación geomecánica; posteriormente en los tramos donde se evidencio intensidad de fractu...