Economic improvement by reducing the execution time in a multifamily project applying Lean Construction and BIM 4D
Descripción del Articulo
        In the projects of multi-family buildings executed by SMEs, the majority have been affected by considerable delays, which are mainly due to the lack of communication, coordination between the interested parties and deficient planning, lack of monitoring and control constant in work. For example, the...
              
            
    
                        | Autores: | , , | 
|---|---|
| Formato: | artículo | 
| Fecha de Publicación: | 2023 | 
| Institución: | Universidad Peruana de Ciencias Aplicadas | 
| Repositorio: | UPC-Institucional | 
| Lenguaje: | inglés | 
| OAI Identifier: | oai:repositorioacademico.upc.edu.pe:10757/673026 | 
| Enlace del recurso: | http://hdl.handle.net/10757/673026 | 
| Nivel de acceso: | acceso embargado | 
| Materia: | BIM buildings cost overruns delays Lean Construction SMEs  | 
| id | 
                  UUPC_5bfb2fad5dfea38f9befafd879f224d8 | 
    
|---|---|
| oai_identifier_str | 
                  oai:repositorioacademico.upc.edu.pe:10757/673026 | 
    
| network_acronym_str | 
                  UUPC | 
    
| network_name_str | 
                  UPC-Institucional | 
    
| repository_id_str | 
                  2670 | 
    
| dc.title.es_PE.fl_str_mv | 
                  Economic improvement by reducing the execution time in a multifamily project applying Lean Construction and BIM 4D | 
    
| title | 
                  Economic improvement by reducing the execution time in a multifamily project applying Lean Construction and BIM 4D | 
    
| spellingShingle | 
                  Economic improvement by reducing the execution time in a multifamily project applying Lean Construction and BIM 4D Higa Yachachin, Kenji Ricardo BIM buildings cost overruns delays Lean Construction SMEs  | 
    
| title_short | 
                  Economic improvement by reducing the execution time in a multifamily project applying Lean Construction and BIM 4D | 
    
| title_full | 
                  Economic improvement by reducing the execution time in a multifamily project applying Lean Construction and BIM 4D | 
    
| title_fullStr | 
                  Economic improvement by reducing the execution time in a multifamily project applying Lean Construction and BIM 4D | 
    
| title_full_unstemmed | 
                  Economic improvement by reducing the execution time in a multifamily project applying Lean Construction and BIM 4D | 
    
| title_sort | 
                  Economic improvement by reducing the execution time in a multifamily project applying Lean Construction and BIM 4D | 
    
| author | 
                  Higa Yachachin, Kenji Ricardo | 
    
| author_facet | 
                  Higa Yachachin, Kenji Ricardo Tello Hurtado, Noe Christian Apolinario Roca, Jose Alberto  | 
    
| author_role | 
                  author | 
    
| author2 | 
                  Tello Hurtado, Noe Christian Apolinario Roca, Jose Alberto  | 
    
| author2_role | 
                  author author  | 
    
| dc.contributor.author.fl_str_mv | 
                  Higa Yachachin, Kenji Ricardo Tello Hurtado, Noe Christian Apolinario Roca, Jose Alberto  | 
    
| dc.subject.es_PE.fl_str_mv | 
                  BIM buildings cost overruns delays Lean Construction SMEs  | 
    
| topic | 
                  BIM buildings cost overruns delays Lean Construction SMEs  | 
    
| description | 
                  In the projects of multi-family buildings executed by SMEs, the majority have been affected by considerable delays, which are mainly due to the lack of communication, coordination between the interested parties and deficient planning, lack of monitoring and control constant in work. For example, these causes can be unsolicited RFIs in the period of observations and delayed approvals, reprocessing of nonconformities, among others. Therefore, a guide was proposed to reduce execution times in multi-family projects executed by SMEs in which BIM 4D and Lean Construction are implemented. In this guide, 4 phases are explained in which BIM 4D and Lean Construction software and tools are applied to analyze interferences and restrictions, as well as optimize the workflow through optimal planning, which would allow avoiding and/or or mitigate delays. However, this guide would not only be reducing delays, but also cost overruns, so there would be an economic improvement apart from the temporary This is demonstrated by implementing the guide in a multifamily project, in which the cost overruns initially generated by delays were reduced by 70%. | 
    
| publishDate | 
                  2023 | 
    
| dc.date.accessioned.none.fl_str_mv | 
                  2024-03-12T15:15:17Z | 
    
| dc.date.available.none.fl_str_mv | 
                  2024-03-12T15:15:17Z | 
    
| dc.date.issued.fl_str_mv | 
                  2023-01-01 | 
    
| dc.type.es_PE.fl_str_mv | 
                  info:eu-repo/semantics/article | 
    
| format | 
                  article | 
    
| dc.identifier.doi.none.fl_str_mv | 
                  10.1109/CONIITI61170.2023.10324105 | 
    
| dc.identifier.uri.none.fl_str_mv | 
                  http://hdl.handle.net/10757/673026 | 
    
| dc.identifier.journal.es_PE.fl_str_mv | 
                  2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings | 
    
| dc.identifier.eid.none.fl_str_mv | 
                  2-s2.0-85179555220 | 
    
| dc.identifier.scopusid.none.fl_str_mv | 
                  SCOPUS_ID:85179555220 | 
    
| dc.identifier.isni.none.fl_str_mv | 
                  0000 0001 2196 144X | 
    
| identifier_str_mv | 
                  10.1109/CONIITI61170.2023.10324105 2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings 2-s2.0-85179555220 SCOPUS_ID:85179555220 0000 0001 2196 144X  | 
    
| url | 
                  http://hdl.handle.net/10757/673026 | 
    
| dc.language.iso.es_PE.fl_str_mv | 
                  eng | 
    
| language | 
                  eng | 
    
| dc.rights.es_PE.fl_str_mv | 
                  info:eu-repo/semantics/embargoedAccess | 
    
| eu_rights_str_mv | 
                  embargoedAccess | 
    
| dc.format.es_PE.fl_str_mv | 
                  application/html | 
    
| dc.publisher.es_PE.fl_str_mv | 
                  Institute of Electrical and Electronics Engineers Inc. | 
    
| dc.source.none.fl_str_mv | 
                  reponame:UPC-Institucional instname:Universidad Peruana de Ciencias Aplicadas instacron:UPC  | 
    
| instname_str | 
                  Universidad Peruana de Ciencias Aplicadas | 
    
| instacron_str | 
                  UPC | 
    
| institution | 
                  UPC | 
    
| reponame_str | 
                  UPC-Institucional | 
    
| collection | 
                  UPC-Institucional | 
    
| dc.source.journaltitle.none.fl_str_mv | 
                  2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings | 
    
| bitstream.url.fl_str_mv | 
                  https://repositorioacademico.upc.edu.pe/bitstream/10757/673026/1/license.txt | 
    
| bitstream.checksum.fl_str_mv | 
                  8a4605be74aa9ea9d79846c1fba20a33 | 
    
| bitstream.checksumAlgorithm.fl_str_mv | 
                  MD5 | 
    
| repository.name.fl_str_mv | 
                  Repositorio académico upc | 
    
| repository.mail.fl_str_mv | 
                  upc@openrepository.com | 
    
| _version_ | 
                  1846066002314395648 | 
    
| spelling | 
                  a5e10c5ed1ee4a9e1a112205d188abaafd86cf3e3111119af8ba29a1e7b5998c350deb4c91c9e1baab0721ee724de40eHiga Yachachin, Kenji RicardoTello Hurtado, Noe ChristianApolinario Roca, Jose Alberto2024-03-12T15:15:17Z2024-03-12T15:15:17Z2023-01-0110.1109/CONIITI61170.2023.10324105http://hdl.handle.net/10757/6730262023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings2-s2.0-85179555220SCOPUS_ID:851795552200000 0001 2196 144XIn the projects of multi-family buildings executed by SMEs, the majority have been affected by considerable delays, which are mainly due to the lack of communication, coordination between the interested parties and deficient planning, lack of monitoring and control constant in work. For example, these causes can be unsolicited RFIs in the period of observations and delayed approvals, reprocessing of nonconformities, among others. Therefore, a guide was proposed to reduce execution times in multi-family projects executed by SMEs in which BIM 4D and Lean Construction are implemented. In this guide, 4 phases are explained in which BIM 4D and Lean Construction software and tools are applied to analyze interferences and restrictions, as well as optimize the workflow through optimal planning, which would allow avoiding and/or or mitigate delays. However, this guide would not only be reducing delays, but also cost overruns, so there would be an economic improvement apart from the temporary This is demonstrated by implementing the guide in a multifamily project, in which the cost overruns initially generated by delays were reduced by 70%.ODS 9: Industria, Innovación e InfraestructuraODS 11: Ciudades y Comunidades SosteniblesODS 8: Trabajo Decente y Crecimiento Económicoapplication/htmlengInstitute of Electrical and Electronics Engineers Inc.info:eu-repo/semantics/embargoedAccessBIMbuildingscost overrunsdelaysLean ConstructionSMEsEconomic improvement by reducing the execution time in a multifamily project applying Lean Construction and BIM 4Dinfo:eu-repo/semantics/article2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedingsreponame:UPC-Institucionalinstname:Universidad Peruana de Ciencias Aplicadasinstacron:UPCLICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorioacademico.upc.edu.pe/bitstream/10757/673026/1/license.txt8a4605be74aa9ea9d79846c1fba20a33MD51false10757/673026oai:repositorioacademico.upc.edu.pe:10757/6730262025-02-18 16:22:48.802Repositorio académico upcupc@openrepository.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 | 
    
| score | 
                  13.977305 | 
    
 Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
    La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).