Modalidad de ejecución y variabilidad del costo de inversión de obras de la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, 2010-2014

Descripción del Articulo

The final report thesis entitled "Method of execution and variability investment cost of works of the Provincial Municipality of Alto Amazonas Yurimaguas district, 2010-2014," was the main problem Is there a relationship between the implementation modality and variability the investment co...

Descripción completa

Detalles Bibliográficos
Autor: Alcalde Rodríguez, Ani
Formato: tesis de grado
Fecha de Publicación:2002
Institución:Universidad Nacional de San Martin - Tarapoto
Repositorio:UNSM-Institucional
Lenguaje:español
OAI Identifier:oai:repositorio.unsm.edu.pe:11458/1557
Enlace del recurso:http://hdl.handle.net/11458/1557
Nivel de acceso:acceso abierto
Materia:Modalidad de ejecución
Variabilidad del costo de inversión de obras
id UNSM_6ff009fc180f46e15752cb4cccb7e67b
oai_identifier_str oai:repositorio.unsm.edu.pe:11458/1557
network_acronym_str UNSM
network_name_str UNSM-Institucional
repository_id_str
dc.title.es_PE.fl_str_mv Modalidad de ejecución y variabilidad del costo de inversión de obras de la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, 2010-2014
title Modalidad de ejecución y variabilidad del costo de inversión de obras de la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, 2010-2014
spellingShingle Modalidad de ejecución y variabilidad del costo de inversión de obras de la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, 2010-2014
Alcalde Rodríguez, Ani
Modalidad de ejecución
Variabilidad del costo de inversión de obras
title_short Modalidad de ejecución y variabilidad del costo de inversión de obras de la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, 2010-2014
title_full Modalidad de ejecución y variabilidad del costo de inversión de obras de la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, 2010-2014
title_fullStr Modalidad de ejecución y variabilidad del costo de inversión de obras de la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, 2010-2014
title_full_unstemmed Modalidad de ejecución y variabilidad del costo de inversión de obras de la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, 2010-2014
title_sort Modalidad de ejecución y variabilidad del costo de inversión de obras de la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, 2010-2014
author Alcalde Rodríguez, Ani
author_facet Alcalde Rodríguez, Ani
author_role author
dc.contributor.advisor.fl_str_mv Sousa Fernández, Réniger
dc.contributor.author.fl_str_mv Alcalde Rodríguez, Ani
dc.subject.es_ES.fl_str_mv Modalidad de ejecución
Variabilidad del costo de inversión de obras
topic Modalidad de ejecución
Variabilidad del costo de inversión de obras
description The final report thesis entitled "Method of execution and variability investment cost of works of the Provincial Municipality of Alto Amazonas Yurimaguas district, 2010-2014," was the main problem Is there a relationship between the implementation modality and variability the investment cost of works of the Provincial Municipality of Alto Amazonas Yurimaguas district, period 2010-2014 to enable the viability of public works for the population? And whose overall objective was to determine the relationship between mode of execution and variability investment cost of works of the Provincial Municipality of Alto Amazonas Yurimaguas district, 2010-2014. The study worked with a type of non-experimental research, with a descriptive and correlational descriptive design level. The population sample corresponded to all information obtained from the studied variables (execution mode and variability investment cost of works) of the Provincial Municipality of Alto Amazonas in the periods 2010, 2011, 2012, 2013 and 2014; using as research tools two guides Summary tab. In the development of research we worked with three modes of execution of works: mixed, direct and contract administration. The mixed mode had a total of 6 projects in the years studied, direct administration modality had 25 projects and contract modality had 63 projects over the past five years. Giving a total of 94 projects carried out in the district of Yurimaguas for three municipal governments. He was from 2010 to 2014 variabilities up to 3 million by 40%, 3 million one thousand-up to 6 million with 30% and works with a value of 6 million one thousand more with variability of 20%. Works with greater variability than 20% are 2; works with 40% greater variability are 3 and works with 30% greater variability are 9. All of them give a total of 14 works with variations greater than those indicated by the SNIP spending. Finally in hiring hypothesis we worked with a significance level of 5%, which was 2.37 Ft while the Fc was greater with a value of 4,095. Therefore hiring the hypothesis indicated that there is a 95% acceptance of the alternative hypothesis, so the Hi accepted: There is a relationship between the implementation modality and variability of the investment cost of works in the Provincial Municipality of Alto Amazonas, Yurimaguas district, 2010-2014
publishDate 2002
dc.date.accessioned.none.fl_str_mv 2016-12-20T09:53:01Z
dc.date.available.none.fl_str_mv 2016-12-20T09:53:01Z
dc.date.issued.fl_str_mv 2002
dc.type.en_US.fl_str_mv info:eu-repo/semantics/bachelorThesis
format bachelorThesis
dc.identifier.citation.es_PE.fl_str_mv Apa
dc.identifier.other.none.fl_str_mv TP_ECON_00007_2016.pdf
dc.identifier.uri.none.fl_str_mv http://hdl.handle.net/11458/1557
identifier_str_mv Apa
TP_ECON_00007_2016.pdf
url http://hdl.handle.net/11458/1557
dc.language.iso.es_PE.fl_str_mv spa
language spa
dc.relation.ispartof.fl_str_mv SUNEDU
dc.rights.en_US.fl_str_mv info:eu-repo/semantics/openAccess
dc.rights.uri.*.fl_str_mv https://creativecommons.org/licenses/by-nc-nd/2.5/pe/
eu_rights_str_mv openAccess
rights_invalid_str_mv https://creativecommons.org/licenses/by-nc-nd/2.5/pe/
dc.format.es_PE.fl_str_mv application/pdf
dc.publisher.es_PE.fl_str_mv Universidad Nacional de San Martín
dc.source.es_PE.fl_str_mv Universidad Nacional de San Martín
Repositorio de tesis - UNSM-T
dc.source.none.fl_str_mv reponame:UNSM-Institucional
instname:Universidad Nacional de San Martin - Tarapoto
instacron:UNSM
instname_str Universidad Nacional de San Martin - Tarapoto
instacron_str UNSM
institution UNSM
reponame_str UNSM-Institucional
collection UNSM-Institucional
bitstream.url.fl_str_mv http://repositorio.unsm.edu.pe/bitstream/11458/1557/5/TP_ECON_00007_2016.pdf.jpg
http://repositorio.unsm.edu.pe/bitstream/11458/1557/4/TP_ECON_00007_2016.pdf.txt
http://repositorio.unsm.edu.pe/bitstream/11458/1557/3/TP_ECON_00007_2016.pdf
bitstream.checksum.fl_str_mv 767d1167a25ee6d55fb439892144cbe9
d7e6d5ff1d5fffdba9046825a12cb502
b6e3d0e680180332cc593fd257d0b3f0
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
repository.name.fl_str_mv Repositorio Institucional de la Universidad
repository.mail.fl_str_mv repositorio@unsm.edu.pe
_version_ 1741962180363812864
spelling Sousa Fernández, Réniger5646915d-d3dd-4c5f-8c29-3b2d9a0fa9f9Alcalde Rodríguez, Ani2016-12-20T09:53:01Z2016-12-20T09:53:01Z2002ApaTP_ECON_00007_2016.pdfhttp://hdl.handle.net/11458/1557The final report thesis entitled "Method of execution and variability investment cost of works of the Provincial Municipality of Alto Amazonas Yurimaguas district, 2010-2014," was the main problem Is there a relationship between the implementation modality and variability the investment cost of works of the Provincial Municipality of Alto Amazonas Yurimaguas district, period 2010-2014 to enable the viability of public works for the population? And whose overall objective was to determine the relationship between mode of execution and variability investment cost of works of the Provincial Municipality of Alto Amazonas Yurimaguas district, 2010-2014. The study worked with a type of non-experimental research, with a descriptive and correlational descriptive design level. The population sample corresponded to all information obtained from the studied variables (execution mode and variability investment cost of works) of the Provincial Municipality of Alto Amazonas in the periods 2010, 2011, 2012, 2013 and 2014; using as research tools two guides Summary tab. In the development of research we worked with three modes of execution of works: mixed, direct and contract administration. The mixed mode had a total of 6 projects in the years studied, direct administration modality had 25 projects and contract modality had 63 projects over the past five years. Giving a total of 94 projects carried out in the district of Yurimaguas for three municipal governments. He was from 2010 to 2014 variabilities up to 3 million by 40%, 3 million one thousand-up to 6 million with 30% and works with a value of 6 million one thousand more with variability of 20%. Works with greater variability than 20% are 2; works with 40% greater variability are 3 and works with 30% greater variability are 9. All of them give a total of 14 works with variations greater than those indicated by the SNIP spending. Finally in hiring hypothesis we worked with a significance level of 5%, which was 2.37 Ft while the Fc was greater with a value of 4,095. Therefore hiring the hypothesis indicated that there is a 95% acceptance of the alternative hypothesis, so the Hi accepted: There is a relationship between the implementation modality and variability of the investment cost of works in the Provincial Municipality of Alto Amazonas, Yurimaguas district, 2010-2014El informe final de tesis titulado “Modalidad de ejecución y variabilidad del costo de inversión de obras de la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, 2010-2014”, tuvo como problema principal la pregunta ¿Existe relación entre la modalidad de ejecución y la variabilidad del costo de inversión de obras de la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, periodo 2010- 2014 que permita la viabilidad de obras públicas para la población? Y cuyo objetivo general fue determinar la relación entre la modalidad de ejecución y la variabilidad del costo de inversión de obras de la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, periodo 2010-2014. En el estudio se trabajó con un tipo de investigación no experimental, con un nivel descriptivo y de diseño descriptivo y correlacional. La muestra poblacional correspondió a toda la información obtenida de las variables estudiadas (modalidad de ejecución y la variabilidad del costo de inversión de obras) de la Municipalidad Provincial de Alto Amazonas en los periodos 2010, 2011, 2012, 2013 y 2014; utilizando como instrumentos de investigación dos guías de ficha resumen. En el desarrollo de la investigación se trabajó con tres modalidades de ejecución de obras: mixta, administración directa y por contrato. La modalidad mixta tuvo un total de 6 proyectos en los años estudiados, la modalidad administración directa tuvo 25 proyectos y la modalidad por contrato tuvo 63 proyectos durante los últimos cinco años. Dando un total de 94 proyectos efectuados en el distrito de Yurimaguas durante tres gobiernos municipales. Se tuvo desde el 2010 hasta el 2014 variabilidades de hasta 3 millones en un 40%, de 3 millones un mil-hasta 6 millones con 30% y en obras con un valor de 6 millones un mil a más con variabilidad del 20%. Las obras con variabilidad mayor al 20% son 2; las obras con variabilidad mayor al 40% son 3 y las obras con variabilidad mayor al 30% son 9. Todas ellas dan un total de 14 obras con variaciones en gasto superiores a las indicadas por el SNIP. Finalmente en la contratación de hipótesis se trabajó con un nivel de significancia del 5%, que la Ft fue de 2.37 mientras que la Fc fue mayor con un valor de 4.095. Por tanto la contratación la hipótesis indicó que existe un 95% de aceptación de la hipótesis alterna, por ello se aceptó la Hi: Existe relación entre la modalidad de ejecución y la variabilidad del costo de inversión de obras en la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, periodo 2010-2014Tesisapplication/pdfspaUniversidad Nacional de San Martíninfo:eu-repo/semantics/openAccesshttps://creativecommons.org/licenses/by-nc-nd/2.5/pe/Universidad Nacional de San MartínRepositorio de tesis - UNSM-Treponame:UNSM-Institucionalinstname:Universidad Nacional de San Martin - Tarapotoinstacron:UNSMModalidad de ejecuciónVariabilidad del costo de inversión de obrasModalidad de ejecución y variabilidad del costo de inversión de obras de la Municipalidad Provincial de Alto Amazonas, distrito de Yurimaguas, 2010-2014info:eu-repo/semantics/bachelorThesisSUNEDUTítulo ProfesionalCiencias EconómicasUniversidad Nacional de San Martín. Facultad de Ciencias EconómicasEconomistaTHUMBNAILTP_ECON_00007_2016.pdf.jpgTP_ECON_00007_2016.pdf.jpgGenerated Thumbnailimage/jpeg1556http://repositorio.unsm.edu.pe/bitstream/11458/1557/5/TP_ECON_00007_2016.pdf.jpg767d1167a25ee6d55fb439892144cbe9MD55TEXTTP_ECON_00007_2016.pdf.txtTP_ECON_00007_2016.pdf.txtExtracted texttext/plain140006http://repositorio.unsm.edu.pe/bitstream/11458/1557/4/TP_ECON_00007_2016.pdf.txtd7e6d5ff1d5fffdba9046825a12cb502MD54ORIGINALTP_ECON_00007_2016.pdfTP_ECON_00007_2016.pdfTexto completoapplication/pdf1873530http://repositorio.unsm.edu.pe/bitstream/11458/1557/3/TP_ECON_00007_2016.pdfb6e3d0e680180332cc593fd257d0b3f0MD5311458/1557oai:repositorio.unsm.edu.pe:11458/15572022-01-06 09:06:39.064Repositorio Institucional de la Universidadrepositorio@unsm.edu.pe
score 13.919025
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).