Aumento de la Disponibilidad Mediante la Implementación de un Plan de Mantenimiento Preventivo a las Maquinarias de la Empresa Atlanta Metal drill s.a.c.
Descripción del Articulo
This research paper describes the implementation of a preventive maintenance plan for the critical machines and equipment involved in the production process of the Atlanta Metal Drill SAC company, guaranteeing an increase in the operational availability of the equipment of the workshop Of the compan...
| Autor: | |
|---|---|
| Formato: | tesis de grado |
| Fecha de Publicación: | 2018 |
| Institución: | Universidad Nacional de Trujillo |
| Repositorio: | UNITRU-Tesis |
| Lenguaje: | español |
| OAI Identifier: | oai:dspace.unitru.edu.pe:20.500.14414/10142 |
| Enlace del recurso: | https://hdl.handle.net/20.500.14414/10142 |
| Nivel de acceso: | acceso abierto |
| Materia: | Mantenimiento preventivo |
| id |
UNIT_a6aa7cf6b41368377f005c7e6ac7918c |
|---|---|
| oai_identifier_str |
oai:dspace.unitru.edu.pe:20.500.14414/10142 |
| network_acronym_str |
UNIT |
| network_name_str |
UNITRU-Tesis |
| repository_id_str |
4801 |
| dc.title.es_PE.fl_str_mv |
Aumento de la Disponibilidad Mediante la Implementación de un Plan de Mantenimiento Preventivo a las Maquinarias de la Empresa Atlanta Metal drill s.a.c. |
| title |
Aumento de la Disponibilidad Mediante la Implementación de un Plan de Mantenimiento Preventivo a las Maquinarias de la Empresa Atlanta Metal drill s.a.c. |
| spellingShingle |
Aumento de la Disponibilidad Mediante la Implementación de un Plan de Mantenimiento Preventivo a las Maquinarias de la Empresa Atlanta Metal drill s.a.c. Ramos Sparrow, Julio Oswaldo Mantenimiento preventivo |
| title_short |
Aumento de la Disponibilidad Mediante la Implementación de un Plan de Mantenimiento Preventivo a las Maquinarias de la Empresa Atlanta Metal drill s.a.c. |
| title_full |
Aumento de la Disponibilidad Mediante la Implementación de un Plan de Mantenimiento Preventivo a las Maquinarias de la Empresa Atlanta Metal drill s.a.c. |
| title_fullStr |
Aumento de la Disponibilidad Mediante la Implementación de un Plan de Mantenimiento Preventivo a las Maquinarias de la Empresa Atlanta Metal drill s.a.c. |
| title_full_unstemmed |
Aumento de la Disponibilidad Mediante la Implementación de un Plan de Mantenimiento Preventivo a las Maquinarias de la Empresa Atlanta Metal drill s.a.c. |
| title_sort |
Aumento de la Disponibilidad Mediante la Implementación de un Plan de Mantenimiento Preventivo a las Maquinarias de la Empresa Atlanta Metal drill s.a.c. |
| author |
Ramos Sparrow, Julio Oswaldo |
| author_facet |
Ramos Sparrow, Julio Oswaldo |
| author_role |
author |
| dc.contributor.advisor.fl_str_mv |
Acosta Horna, David |
| dc.contributor.author.fl_str_mv |
Ramos Sparrow, Julio Oswaldo |
| dc.subject.es_PE.fl_str_mv |
Mantenimiento preventivo |
| topic |
Mantenimiento preventivo |
| description |
This research paper describes the implementation of a preventive maintenance plan for the critical machines and equipment involved in the production process of the Atlanta Metal Drill SAC company, guaranteeing an increase in the operational availability of the equipment of the workshop Of the company, in an efficient and safe way. In order to meet this objective, it was necessary to collect information on the history of failure times of all the machines in the area of master, being a total of 23 machines with which the company has such as lathes, milling machines, boring machines, welding machines, Compressors, crane bridges and drills. The machines under study were subjected to a criticality analysis, resulting in four critical machines due to their higher incidence of failures: vertical lathe lathe lathe and boring machine. The maintenance indicators were then calculated, obtaining a low availability, but after the implementation of the preventive maintenance plan, it was possible to increase the availability of critical machines by more than 10%, ie the parallel lathe From 83.33% to 93.84%; The milling machine from 84.72% to 94.79% and the boring machine from 86.97 to 96.96, thus improving the performance of the machines. Through the development of the methodology for the preventive maintenance plan throughout the development of the thesis were determined the following basic points such as Maintenance indicators Comparison of maintenance indicators Economic evaluation to determine that the development of this thesis through the preventive maintenance plan is really feasible |
| publishDate |
2018 |
| dc.date.accessioned.none.fl_str_mv |
3/28/2018 13:00 |
| dc.date.available.none.fl_str_mv |
3/28/2018 13:00 |
| dc.date.issued.fl_str_mv |
2018-01-16 |
| dc.type.es_PE.fl_str_mv |
info:eu-repo/semantics/bachelorThesis |
| format |
bachelorThesis |
| dc.identifier.uri.none.fl_str_mv |
https://hdl.handle.net/20.500.14414/10142 |
| url |
https://hdl.handle.net/20.500.14414/10142 |
| dc.language.iso.es_PE.fl_str_mv |
spa |
| language |
spa |
| dc.relation.ispartof.fl_str_mv |
SUNEDU |
| dc.relation.ispartofseries.none.fl_str_mv |
TMEC;9761-9762 |
| dc.rights.es_PE.fl_str_mv |
info:eu-repo/semantics/openAccess |
| eu_rights_str_mv |
openAccess |
| dc.publisher.es_PE.fl_str_mv |
Universidad Nacional de Trujillo |
| dc.source.es_PE.fl_str_mv |
Universidad Nacional de Trujillo Repositorio institucional - UNITRU |
| dc.source.none.fl_str_mv |
reponame:UNITRU-Tesis instname:Universidad Nacional de Trujillo instacron:UNITRU |
| instname_str |
Universidad Nacional de Trujillo |
| instacron_str |
UNITRU |
| institution |
UNITRU |
| reponame_str |
UNITRU-Tesis |
| collection |
UNITRU-Tesis |
| bitstream.url.fl_str_mv |
https://dspace.unitru.edu.pe/bitstreams/fe74b541-ebcc-4e92-8ac2-7fef1b4881a1/download https://dspace.unitru.edu.pe/bitstreams/02aa1159-f7d4-4900-87d4-530c61989cbc/download |
| bitstream.checksum.fl_str_mv |
b8f0105b41754a349e7b255c45af6bae 8a4605be74aa9ea9d79846c1fba20a33 |
| bitstream.checksumAlgorithm.fl_str_mv |
MD5 MD5 |
| repository.name.fl_str_mv |
Repositorio Institucional - UNITRU |
| repository.mail.fl_str_mv |
repositorios@unitru.edu.pe |
| _version_ |
1807289837006356480 |
| spelling |
Acosta Horna, DavidRamos Sparrow, Julio Oswaldo3/28/2018 13:003/28/2018 13:002018-01-16https://hdl.handle.net/20.500.14414/10142This research paper describes the implementation of a preventive maintenance plan for the critical machines and equipment involved in the production process of the Atlanta Metal Drill SAC company, guaranteeing an increase in the operational availability of the equipment of the workshop Of the company, in an efficient and safe way. In order to meet this objective, it was necessary to collect information on the history of failure times of all the machines in the area of master, being a total of 23 machines with which the company has such as lathes, milling machines, boring machines, welding machines, Compressors, crane bridges and drills. The machines under study were subjected to a criticality analysis, resulting in four critical machines due to their higher incidence of failures: vertical lathe lathe lathe and boring machine. The maintenance indicators were then calculated, obtaining a low availability, but after the implementation of the preventive maintenance plan, it was possible to increase the availability of critical machines by more than 10%, ie the parallel lathe From 83.33% to 93.84%; The milling machine from 84.72% to 94.79% and the boring machine from 86.97 to 96.96, thus improving the performance of the machines. Through the development of the methodology for the preventive maintenance plan throughout the development of the thesis were determined the following basic points such as Maintenance indicators Comparison of maintenance indicators Economic evaluation to determine that the development of this thesis through the preventive maintenance plan is really feasibleEl presente trabajo de investigación, describe la implementación de un plan de mantenimiento preventivo para las máquinas y equipos críticos que intervienen en el proceso de producción de la empresa Atlanta Metal Drill S.A.C, garantizando un aumento de la disponibilidad operacional de los equipos del taller de maestranza de la empresa, de una manera eficiente y segura. Para cumplir dicho objetivo fue necesario la recopilación de información de historiales de los tiempos de fallas de todas las maquinas del área de maestranza, siendo un total de 23 máquinas con la que dispone la empresa tales como tornos, fresadoras, mandriladora, máquinas de soldar, compresoras, puentes grúa y taladros. Las maquinas en estudio se sometieron a un análisis de criticidad, resultando cuatro máquinas críticas debido a su mayor incidencia de fallas: fresadora torno paralelo torno vertical y mandriladora. Luego se procedió a realizar el cálculo de indicadores de mantenimiento, obteniendo una baja disponibilidad, pero después de la implementación del plan de mantenimiento preventivo, se logró aumentar la disponibilidad de las máquinas críticas en más de un 10%, es decir, el torno paralelo de 83.33 % a 93.84%; la fresadora de 84.72% a 94.79% y la mandriladora de 86.97 a 96.96, mejorando de esta manera el rendimiento de la maquinarias. Mediante el desarrollo de la metodología para el plan de mantenimiento preventivo a lo largo del desarrollo de la tesis se determinaron lo siguientes puntos básicos tales como: Indicadores de mantenimiento Comparación de indicadores de mantenimiento Evaluación económica para determinar que el desarrollo de esta tesis a través del plan de mantenimiento preventivo es realmente factible.TesisspaUniversidad Nacional de TrujilloTMEC;9761-9762SUNEDUinfo:eu-repo/semantics/openAccessUniversidad Nacional de TrujilloRepositorio institucional - UNITRUreponame:UNITRU-Tesisinstname:Universidad Nacional de Trujilloinstacron:UNITRUMantenimiento preventivoAumento de la Disponibilidad Mediante la Implementación de un Plan de Mantenimiento Preventivo a las Maquinarias de la Empresa Atlanta Metal drill s.a.c.info:eu-repo/semantics/bachelorThesisTítulo ProfesionalIngeniero MecánicoIngenieríaUniversidad Nacional de Trujillo. Facultad de IngenieríaORIGINALRamos Sparrow, Julio Oswaldo.pdfRamos Sparrow, Julio Oswaldo.pdfapplication/pdf3511924https://dspace.unitru.edu.pe/bitstreams/fe74b541-ebcc-4e92-8ac2-7fef1b4881a1/downloadb8f0105b41754a349e7b255c45af6baeMD51LICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://dspace.unitru.edu.pe/bitstreams/02aa1159-f7d4-4900-87d4-530c61989cbc/download8a4605be74aa9ea9d79846c1fba20a33MD5220.500.14414/10142oai:dspace.unitru.edu.pe:20.500.14414/101422024-05-14 08:49:17.36open.accesshttps://dspace.unitru.edu.peRepositorio Institucional - UNITRUrepositorios@unitru.edu.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 |
| score |
13.8938055 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).