Diseño, construcción e instalación de un prototipo con controlador lógico programable para automatizar el tiempo de funcionamiento de cuatro electrobombas

Descripción del Articulo

The main objective of the present work of thesis was: laying plans constructing and installing a prototype with programmable logic controller to automate the passage of time of functioning of four electric pumps. In the present investigation, firstly, a revision of the at one PLC has been done (ladd...

Descripción completa

Detalles Bibliográficos
Autores: Del Águila Zárate, Jesús Ausberto, Haquiwara Chuquipiondo, Irma Luzmila
Formato: tesis de grado
Fecha de Publicación:2022
Institución:Universidad Nacional De La Amazonía Peruana
Repositorio:UNAPIquitos-Institucional
Lenguaje:español
OAI Identifier:oai:repositorio.unapiquitos.edu.pe:20.500.12737/8305
Enlace del recurso:https://hdl.handle.net/20.500.12737/8305
Nivel de acceso:acceso abierto
Materia:Diseños industriales
Prototipos
Instalación
Controladores programables
Ingeniería hidráulica
https://purl.org/pe-repo/ocde/ford#1.04.05
https://purl.org/pe-repo/ocde/ford#2.04.02
Descripción
Sumario:The main objective of the present work of thesis was: laying plans constructing and installing a prototype with programmable logic controller to automate the passage of time of functioning of four electric pumps. In the present investigation, firstly, a revision of the at one PLC has been done (ladder and BDF); from now on a sketch of the prototype automated of four electric pumps, where it was described to each one of his main components came true; straightaway, came true the design and simulation of the electric circuit in the programmable logic controller (PLC), with the aim of verifying activation and deactivation of the physical exits of the PLC according to what's programmed, this in turn allowed determining the quantity of physical receipts and expenditures that were used in the PLC; from now on, the relation between the state of every an one belonging to the physical exits of the PLC was determined: Q1, Q2, Q3 and Q4, with the state of the check mark of rabbetting (M1) and the passage of time of functioning of the four electric pumps. Finally, seven performance testings of the prototype automated, where the residue of the passage of time of functioning of the four electric pumps proved to be similar to zero have come true, which indicates that the four electric pumps do not have any delays when catches fire or becoming extinguished, according to the passage of time programmed in the timers T001, T002 y T003, this proved that the PLC works with an efficiency of the 100 %. In this way it came true with the realistic general and he tried the general hypothesis.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).