This research project focuses on enhancing manufacturing efficiency through the application of Master Production Schedule (MPS), KAIZEN, and Single Minute Exchange of Die (SMED) tools. The company's initial efficiency level of 58.8% is attributed to factors such as a lack of trained personnel,...
| Autores: | , |
|---|---|
| Formato: | tesis de grado |
| Fecha de Publicación: | 2025 |
| Institución: | Universidad de Lima |
| Repositorio: | ULIMA-Institucional |
| Lenguaje: | inglés |
| OAI Identifier: | oai:repositorio.ulima.edu.pe:20.500.12724/22910 |
| Enlace del recurso: | https://hdl.handle.net/20.500.12724/22910 |
| Nivel de acceso: | acceso abierto |
| Materia: | Prendas de vestir Telas de algodón Fibras textiles Industria textil algodonera Industria del vestido Pequeñas y medianas empresas Proceso de mejora continua Producción eficiente Administración de la producción https://purl.org/pe-repo/ocde/ford#2.11.04 |
| Sumario: | This research project focuses on enhancing manufacturing efficiency through the application of Master Production Schedule (MPS), KAIZEN, and Single Minute Exchange of Die (SMED) tools. The company's initial efficiency level of 58.8% is attributed to factors such as a lack of trained personnel, absence of a requirements plans, and wastage of raw materials, primarily due to insufficient inputs during production. To address these issues, the project measured key indicators such as efficiency level, effective production hours, and raw material waste. The engineering tools MPS, KAIZEN, and SMED were then employed to create a production and supply tool, implement training plans for operators to reduce losses and reprocessing, and redesign the workshop layout to decrease production times and achieve line production. During the initial two months of implementation (August and September 2023), the project successfully increased the average production efficiency to 76.79%, reduced raw material waste to 2.11 kg per day on average, and extended the effective production time to 7.08 hours per day. The economic benefits of the project were realized, with a 6-month projection demonstrating positive results. In a pessimistic scenario, the net present value (NPV) was only $1487.38 lower than without project implementation. In a normal scenario, the project yielded impressive results, including an NPV of $15 385.67, an internal rate of return (IRR) of 69%, a benefit-cost ratio (B/C) of 4.5, and a payback period of one month and 15 days. |
|---|
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).