Propuesta de mejora para la reducción de costos de producción en proyectos de pilotes pre - excavados en la empresa PSV Constructores S.A.

Descripción del Articulo

Globalization and human being tendency to create a connection between nature and the infrastructure necessary for industrial activity constitute the most effective combination when generating improvements in the foundations of the great buildings and bridges of the world. The taller a building is or...

Descripción completa

Detalles Bibliográficos
Autores: Peña Camerano, Natalia Alejandra, Ramírez Campos, Diana Alejandra
Formato: tesis de grado
Fecha de Publicación:2020
Institución:Universidad de Lima
Repositorio:ULIMA-Institucional
Lenguaje:español
OAI Identifier:oai:repositorio.ulima.edu.pe:20.500.12724/12032
Enlace del recurso:https://hdl.handle.net/20.500.12724/12032
Nivel de acceso:acceso abierto
Materia:Foundations on piles
Structures (Construction)
Cost control
Cimentaciones sobre pilotes
Estructuras (Construcción)
Control de costes
https://purl.org/pe-repo/ocde/ford#2.11.04
id RULI_1fad29981dc863cebe1721f0efac3e9b
oai_identifier_str oai:repositorio.ulima.edu.pe:20.500.12724/12032
network_acronym_str RULI
network_name_str ULIMA-Institucional
repository_id_str 3883
dc.title.es_PE.fl_str_mv Propuesta de mejora para la reducción de costos de producción en proyectos de pilotes pre - excavados en la empresa PSV Constructores S.A.
title Propuesta de mejora para la reducción de costos de producción en proyectos de pilotes pre - excavados en la empresa PSV Constructores S.A.
spellingShingle Propuesta de mejora para la reducción de costos de producción en proyectos de pilotes pre - excavados en la empresa PSV Constructores S.A.
Peña Camerano, Natalia Alejandra
Foundations on piles
Structures (Construction)
Cost control
Cimentaciones sobre pilotes
Estructuras (Construcción)
Control de costes
https://purl.org/pe-repo/ocde/ford#2.11.04
title_short Propuesta de mejora para la reducción de costos de producción en proyectos de pilotes pre - excavados en la empresa PSV Constructores S.A.
title_full Propuesta de mejora para la reducción de costos de producción en proyectos de pilotes pre - excavados en la empresa PSV Constructores S.A.
title_fullStr Propuesta de mejora para la reducción de costos de producción en proyectos de pilotes pre - excavados en la empresa PSV Constructores S.A.
title_full_unstemmed Propuesta de mejora para la reducción de costos de producción en proyectos de pilotes pre - excavados en la empresa PSV Constructores S.A.
title_sort Propuesta de mejora para la reducción de costos de producción en proyectos de pilotes pre - excavados en la empresa PSV Constructores S.A.
author Peña Camerano, Natalia Alejandra
author_facet Peña Camerano, Natalia Alejandra
Ramírez Campos, Diana Alejandra
author_role author
author2 Ramírez Campos, Diana Alejandra
author2_role author
dc.contributor.advisor.fl_str_mv Echazú Brown, Julio Roberto
dc.contributor.author.fl_str_mv Peña Camerano, Natalia Alejandra
Ramírez Campos, Diana Alejandra
dc.subject.en_EN.fl_str_mv Foundations on piles
Structures (Construction)
Cost control
topic Foundations on piles
Structures (Construction)
Cost control
Cimentaciones sobre pilotes
Estructuras (Construcción)
Control de costes
https://purl.org/pe-repo/ocde/ford#2.11.04
dc.subject.es_PE.fl_str_mv Cimentaciones sobre pilotes
Estructuras (Construcción)
Control de costes
dc.subject.ocde.none.fl_str_mv https://purl.org/pe-repo/ocde/ford#2.11.04
description Globalization and human being tendency to create a connection between nature and the infrastructure necessary for industrial activity constitute the most effective combination when generating improvements in the foundations of the great buildings and bridges of the world. The taller a building is or the greater the distance between the supports of a bridge, the greater the demands are of the foundations that support them. Deep foundations carried out with drilled piles have become the most practical and economical solution when satisfying resistance requirements dependent on superstructures. These piles vary in length and diameter according to the demands of the project, and in order for it to be executed, drilling accessories and heavy machinery are used, that allow in synthesis, to make a hole in the ground, similar to the action of drilling a hole in the wall of a house with an electric hand drill. Drilling tools use consumables known as bits, which constitute the fusible element in the production train, since they have a relatively low cost compared to the cost of the machine itself, and are manufactured and used exclusively to wear out, fracture or fail during the drilling process of the piles. A priori, there is currently no way to predict the number of bits that will be used in the execution of the piles of an “x” project. The above would have no interest if the bits are made in the country of “x” project, however, because they are brought in from China or Germany by sea, with a delivery time ranging from 45 to 60 days, there is a lot of interest on behalf of the companies. When the estimate of the number of bits is not correct and the project runs out of these consumables without having finished all the drilled piles, the logistics supply chain has to intervene to accelerate the acquisition by air, which also translates to a dead time of production from 7 to 10 days, accompanied by the increase in general expenses, acquisition of a product at a higher cost and the most shocking for the company, penalties for stoppages or being out of contractual term. Under this context, the question that arises is the following: Is it possible to reduce production costs in a drilling rigs project with certain geometric characteristics that guarantees the profitability of the project and customer satisfaction to avoid negative impacts?
publishDate 2020
dc.date.accessioned.none.fl_str_mv 2020-12-14T16:29:34Z
dc.date.available.none.fl_str_mv 2020-12-14T16:29:34Z
dc.date.issued.fl_str_mv 2020
dc.type.none.fl_str_mv info:eu-repo/semantics/bachelorThesis
dc.type.other.none.fl_str_mv Tesis
format bachelorThesis
dc.identifier.citation.es_PE.fl_str_mv Peña Camerano, N. A. y Ramírez Campos, D.A. (2020). Propuesta de mejora para la reducción de costos de producción en proyectos de pilotes pre - excavados en la empresa PSV Constructores S.A. [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio ULima. https://hdl.handle.net/20.500.12724/12032
dc.identifier.uri.none.fl_str_mv https://hdl.handle.net/20.500.12724/12032
dc.identifier.isni.none.fl_str_mv 121541816
identifier_str_mv Peña Camerano, N. A. y Ramírez Campos, D.A. (2020). Propuesta de mejora para la reducción de costos de producción en proyectos de pilotes pre - excavados en la empresa PSV Constructores S.A. [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio ULima. https://hdl.handle.net/20.500.12724/12032
121541816
url https://hdl.handle.net/20.500.12724/12032
dc.language.iso.none.fl_str_mv spa
language spa
dc.relation.ispartof.fl_str_mv SUNEDU
dc.rights.*.fl_str_mv info:eu-repo/semantics/openAccess
dc.rights.uri.*.fl_str_mv https://creativecommons.org/licenses/by-nc-sa/4.0/
eu_rights_str_mv openAccess
rights_invalid_str_mv https://creativecommons.org/licenses/by-nc-sa/4.0/
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidad de Lima
dc.publisher.country.none.fl_str_mv PE
publisher.none.fl_str_mv Universidad de Lima
dc.source.none.fl_str_mv Repositorio Institucional - Ulima
Universidad de Lima
reponame:ULIMA-Institucional
instname:Universidad de Lima
instacron:ULIMA
instname_str Universidad de Lima
instacron_str ULIMA
institution ULIMA
reponame_str ULIMA-Institucional
collection ULIMA-Institucional
bitstream.url.fl_str_mv https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12032/4/Pe%c3%b1a_Camerano_Natalia_AlejandraT.pdf.txt
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12032/3/license.txt
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12032/1/Pe%c3%b1a_Camerano_Natalia_AlejandraT.pdf
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12032/2/license_rdf
https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12032/5/Pe%c3%b1a_Camerano_Natalia_AlejandraT.pdf.jpg
bitstream.checksum.fl_str_mv 52a77289ef9b9afe8bbcae2f206f8b5f
8a4605be74aa9ea9d79846c1fba20a33
8514c59aac3be71c4d53e6e3d322dd57
8fc46f5e71650fd7adee84a69b9163c2
a502a10d258cebd980f7164badcb1a6c
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
MD5
repository.name.fl_str_mv Repositorio Universidad de Lima
repository.mail.fl_str_mv repositorio@ulima.edu.pe
_version_ 1846612265413902336
spelling Echazú Brown, Julio RobertoPeña Camerano, Natalia AlejandraRamírez Campos, Diana Alejandra2020-12-14T16:29:34Z2020-12-14T16:29:34Z2020Peña Camerano, N. A. y Ramírez Campos, D.A. (2020). Propuesta de mejora para la reducción de costos de producción en proyectos de pilotes pre - excavados en la empresa PSV Constructores S.A. [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio ULima. https://hdl.handle.net/20.500.12724/12032https://hdl.handle.net/20.500.12724/12032121541816Globalization and human being tendency to create a connection between nature and the infrastructure necessary for industrial activity constitute the most effective combination when generating improvements in the foundations of the great buildings and bridges of the world. The taller a building is or the greater the distance between the supports of a bridge, the greater the demands are of the foundations that support them. Deep foundations carried out with drilled piles have become the most practical and economical solution when satisfying resistance requirements dependent on superstructures. These piles vary in length and diameter according to the demands of the project, and in order for it to be executed, drilling accessories and heavy machinery are used, that allow in synthesis, to make a hole in the ground, similar to the action of drilling a hole in the wall of a house with an electric hand drill. Drilling tools use consumables known as bits, which constitute the fusible element in the production train, since they have a relatively low cost compared to the cost of the machine itself, and are manufactured and used exclusively to wear out, fracture or fail during the drilling process of the piles. A priori, there is currently no way to predict the number of bits that will be used in the execution of the piles of an “x” project. The above would have no interest if the bits are made in the country of “x” project, however, because they are brought in from China or Germany by sea, with a delivery time ranging from 45 to 60 days, there is a lot of interest on behalf of the companies. When the estimate of the number of bits is not correct and the project runs out of these consumables without having finished all the drilled piles, the logistics supply chain has to intervene to accelerate the acquisition by air, which also translates to a dead time of production from 7 to 10 days, accompanied by the increase in general expenses, acquisition of a product at a higher cost and the most shocking for the company, penalties for stoppages or being out of contractual term. Under this context, the question that arises is the following: Is it possible to reduce production costs in a drilling rigs project with certain geometric characteristics that guarantees the profitability of the project and customer satisfaction to avoid negative impacts?La globalización y la tendencia del ser humano a hacer un match entre la naturaleza y la infraestructura necesaria para la actividad industrial, integran la combinación más efectiva a la hora de generar mejoras en los cimientos de las grandes edificaciones y puentes del mundo. Entre más altura tenga un edificio o entre más distancia tengan los apoyos de un puente, mayores serán las exigencias de las cimentaciones que los soportan. Las cimentaciones profundas realizadas con pilotes perforados se han convertido en la solución más práctica y económica al momento de satisfacer los requerimientos de las resistencias dependientes de las superestructuras. Estos pilotes varían en longitud y diámetro según las demandas del proyecto, y para su proceso de ejecución se utilizan accesorios de perforación y maquinaria pesada que permite, en síntesis, realizar un agujero en el suelo, similar a la acción de perforar una pared de una casa con un taladro eléctrico de mano. Las herramientas de perforación utilizan unos consumibles conocidos como “picas”, las cuales constituyen el elemento fusible en el tren de producción, dado que presentan un costo relativamente bajo comparado con el costo de la máquina en sí, y se fabrican y se usan exclusivamente para que se desgasten, fracturen o fallen durante el proceso de perforación de los pilotes. De manera a priori, no existe actualmente una manera de predecir el número de picas que se utilizarán en la ejecución de los pilotes de un proyecto. Lo anterior no tuviera ningún interés si no fuera porque estos insertos no se fabrican en el país, sino que se traen desde China o Alemania vía marítima con un tiempo de entrega que oscila entre los 45 a 60 días. Cuando la estimación del número de picas no es la correcta y el proyecto se queda sin estos consumibles sin haber terminado la totalidad de los pilotes perforados, la cadena de suministro tiene que intervenir para acelerar la adquisición vía aérea, que igual se traduce a un tiempo muerto de producción de 7 a 10 días, acompañado del incremento de los gastos generales, adquisición de un producto a un costo mayor y lo más impactante para la empresa, penalidades por paralizaciones o estar fuera de plazo contractual. Bajo este contexto, la pregunta problema que nace es la siguiente: ¿Es posible reducir los costos de producción en un proyecto de pilotes pre-excavados con ciertas características geométricas que permitan garantizar la rentabilidad del proyecto y satisfacción del cliente para evitar impactos negativos?.Tesisapplication/pdfspaUniversidad de LimaPEinfo:eu-repo/semantics/openAccesshttps://creativecommons.org/licenses/by-nc-sa/4.0/Repositorio Institucional - UlimaUniversidad de Limareponame:ULIMA-Institucionalinstname:Universidad de Limainstacron:ULIMAFoundations on pilesStructures (Construction)Cost controlCimentaciones sobre pilotesEstructuras (Construcción)Control de costeshttps://purl.org/pe-repo/ocde/ford#2.11.04Propuesta de mejora para la reducción de costos de producción en proyectos de pilotes pre - excavados en la empresa PSV Constructores S.A.info:eu-repo/semantics/bachelorThesisTesisSUNEDUTítulo ProfesionalIngeniería IndustrialUniversidad de Lima. Facultad de Ingeniería y ArquitecturaIngeniero Industrial7220267030730346549624https://purl.org/pe-repo/renati/level#tituloProfesionalhttps://purl.org/pe-repo/renati/type#tesisOITEXTPeña_Camerano_Natalia_AlejandraT.pdf.txtPeña_Camerano_Natalia_AlejandraT.pdf.txtExtracted texttext/plain204369https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12032/4/Pe%c3%b1a_Camerano_Natalia_AlejandraT.pdf.txt52a77289ef9b9afe8bbcae2f206f8b5fMD54LICENSElicense.txtlicense.txttext/plain; charset=utf-81748https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12032/3/license.txt8a4605be74aa9ea9d79846c1fba20a33MD53ORIGINALPeña_Camerano_Natalia_AlejandraT.pdfPeña_Camerano_Natalia_AlejandraT.pdfapplication/pdf1545763https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12032/1/Pe%c3%b1a_Camerano_Natalia_AlejandraT.pdf8514c59aac3be71c4d53e6e3d322dd57MD51CC-LICENSElicense_rdflicense_rdfapplication/rdf+xml; charset=utf-81037https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12032/2/license_rdf8fc46f5e71650fd7adee84a69b9163c2MD52THUMBNAILPeña_Camerano_Natalia_AlejandraT.pdf.jpgPeña_Camerano_Natalia_AlejandraT.pdf.jpgGenerated Thumbnailimage/jpeg11556https://repositorio.ulima.edu.pe/bitstream/20.500.12724/12032/5/Pe%c3%b1a_Camerano_Natalia_AlejandraT.pdf.jpga502a10d258cebd980f7164badcb1a6cMD5520.500.12724/12032oai:repositorio.ulima.edu.pe:20.500.12724/120322025-09-18 12:39:01.898Repositorio Universidad de Limarepositorio@ulima.edu.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
score 13.0632
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).