Maximizing energy efficiency in partial loads of a multigroup hydroelectric power station integrated within the national interconnected system
Descripción del Articulo
In multigroup hydroelectric plant operating at partial loads, the maximum each group efficiency and the random combination of these, differ from the design efficiency of the plant at full load. These plants are conditioned to operate at partial loads, both in times of drought and periods of oversupp...
| Autores: | , , |
|---|---|
| Formato: | artículo |
| Fecha de Publicación: | 2015 |
| Institución: | Universidad Nacional de Ingeniería |
| Repositorio: | Revistas - Universidad Nacional de Ingeniería |
| Lenguaje: | español |
| OAI Identifier: | oai:oai:revistas.uni.edu.pe:article/48 |
| Enlace del recurso: | https://revistas.uni.edu.pe/index.php/tecnia/article/view/48 |
| Nivel de acceso: | acceso abierto |
| Materia: | central hidroeléctrica multigrupo cargas parciales maximización despacho económico estiaje sistema interconectado nacional mulltigroup hydroelectric plant partial loads maximization economic dispatch time of drought national grid |
| Sumario: | In multigroup hydroelectric plant operating at partial loads, the maximum each group efficiency and the random combination of these, differ from the design efficiency of the plant at full load. These plants are conditioned to operate at partial loads, both in times of drought and periods of oversupply national electric grid. The period of drought in Peru is nine months per year, a situation that involves economic losses due to inadequate flow regulation and group choice efficiencies conditions below their optimum values. The aim of this work is the development optimizing efficiency process of a multigroup hydroelectric power plant, for any level of power generated in the daily interconnected generation program. The results are maximizing turbine efficiency and combined-group for each power output of the plant, outside its nominal conditions, also a computer program is constructed in Matlab to integrate the automated system of hydroelectric power plant. Its application can reduce generation costs and increases plant availability; also forms a methodological pattern of use in other multigroup hydroelectric plants . |
|---|
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).