A First Approach to the Execution of Construction Supervision Contracts in Public Projects in Peru

Descripción del Articulo

The purpose of this paper is to address a first approach to the execution of construction supervision contracts in public projects in Peru mains issues and challenges faced in the execution of construction supervision contracts, signed under Peruvian regulations for quality control and technical sup...

Descripción completa

Detalles Bibliográficos
Autores: Morón Urbina, Juan Carlos, Limas Calderón, Sherin
Formato: artículo
Fecha de Publicación:2023
Institución:Pontificia Universidad Católica del Perú
Repositorio:Revistas - Pontificia Universidad Católica del Perú
Lenguaje:español
OAI Identifier:oai:revistaspuc:article/27259
Enlace del recurso:http://revistas.pucp.edu.pe/index.php/iusetveritas/article/view/27259
Nivel de acceso:acceso abierto
Materia:Supervisión
Control
Calidad
Construcción de obras
Consultoría especializada
Ingeniería de Consulta
Supervision
Quality
Construction of works
Specialized consultancy
Consultation Engineering
Descripción
Sumario:The purpose of this paper is to address a first approach to the execution of construction supervision contracts in public projects in Peru mains issues and challenges faced in the execution of construction supervision contracts, signed under Peruvian regulations for quality control and technical support in the contractual management of the construction of public works under the regime general and/or in the execution of concession contracts. Given the importance of these contracts in the development at the engineering or construction stage of an infrastructure investment project, their regulation, and the correct understanding of the nature of the provision of these specialized services is the central object of the present article. We briefly analyze the background of the figure of the “work supervisor” in Peruvian regulations, to identify its purpose and its scope in public works under the general regime and in concession contracts. Finally, in this article the main problems that are identified in the execution of this type of supervision contracts are raised and how they end up having a negative impact on the development of the construction of the work project, even conditioning its frustration.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).