Statistical model for assessing the resilience of the public supply chain and its influence on regional project management in Peru

Descripción del Articulo

Public infrastructure projects in Peru face structural challenges in supply chain management, resulting in delays, cost overruns, and quality deficiencies. This study examined the extent to which supply chain resilience influences project effectiveness regarding time, cost, and quality standards. A...

Descripción completa

Detalles Bibliográficos
Autor: Talenas Quispe, Raul Walther
Formato: artículo
Fecha de Publicación:2025
Institución:Universidad Nacional Autónoma de Tayacaja Daniel Hernández Morillo
Repositorio:Revista de investigación científica y tecnológica Llamkasun
Lenguaje:español
OAI Identifier:oai:ojs2.llamkasun.unat.edu.pe:article/139
Enlace del recurso:https://llamkasun.unat.edu.pe/index.php/revista/article/view/139
Nivel de acceso:acceso abierto
Materia:Resiliencia en la cadena de suministro
Proyectos de infraestructura
Ciclo Deming
Gestión pública
Supply chain resilience
Infrastructure projects
Deming Cycle
Public management
Descripción
Sumario:Public infrastructure projects in Peru face structural challenges in supply chain management, resulting in delays, cost overruns, and quality deficiencies. This study examined the extent to which supply chain resilience influences project effectiveness regarding time, cost, and quality standards. A quantitative, correlational–explanatory, non-experimental design was adopted, using surveys administered to professionals engaged in public works management. Statistical analysis included Pearson correlation, linear regression, Chi-square, ANOVA, and logistic regression. Results showed a strong and significant relationship between resilience and effectiveness (r = 0.782; p < 0.05), with resilience explaining 61.1% of performance variability. Critical deficiencies were identified in administrative coordination, reliance on external suppliers, and insufficient quality control. Conversely, implementing the Deming Cycle (PDCA) and PMBOK practices had a positive effect, accounting for 50.5% of the improvement in resilience and effectiveness. The findings conclude that resilience is a structural determinant of public project success, and strengthening it through supplier diversification, effective coordination, and systematic quality control is essential to ensure the sustainability of infrastructure investments.
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).