Design of joint provision of tailings and clearence in Yauricocha mine
Descripción del Articulo
The feasibility of co-disposal of tailing and clearance is been evaluated in Yauricocha Mine, for which one it is been studied the involved variables such as cut and compression resistance, permeability, density, particle size, chemical composition for tailing and clearance of the mine, leaching fac...
| Autores: | , , |
|---|---|
| Formato: | artículo |
| Fecha de Publicación: | 2011 |
| Institución: | Universidad Nacional Mayor de San Marcos |
| Repositorio: | Revista UNMSM - IIGEO |
| Lenguaje: | español |
| OAI Identifier: | oai:ojs.csi.unmsm:article/763 |
| Enlace del recurso: | https://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/763 |
| Nivel de acceso: | acceso abierto |
| Materia: | clearence tailing clearance’s holes alkaline tailing landfill stable storage desmonte relave vacíos en desmonte relave alcalino botadero almacenaje estable |
| id |
1682-3087_7463749d583da93cd75389ce7bd0477f |
|---|---|
| oai_identifier_str |
oai:ojs.csi.unmsm:article/763 |
| network_acronym_str |
1682-3087 |
| network_name_str |
Revista UNMSM - IIGEO |
| spelling |
Design of joint provision of tailings and clearence in Yauricocha mineDiseño de disposición conjunta de relaves y desmonte en la mina YauricochaOrtiz Sánchez, OswaldoCanchari Silverio, GodeliaGiraldo Paredez, Emilianoclearencetailingclearance’s holesalkaline tailinglandfillstable storagedesmonterelavevacíos en desmonterelave alcalinobotaderoalmacenaje estableThe feasibility of co-disposal of tailing and clearance is been evaluated in Yauricocha Mine, for which one it is been studied the involved variables such as cut and compression resistance, permeability, density, particle size, chemical composition for tailing and clearance of the mine, leaching facility of minerals in both, influence of seismic acceleration in the stability of tailing and clearance’s slopes. It was found that the most stable mixture from a physical and chemical point of view is three of clearance to one of tailing (3C/1T). The safety factor calculated by the Bishop algorithm SLIDE, is above 1.1 in pseudo-static conditions. In addition, there were evaluated more forms of joint storage for clearance-tailing, concluding that for the Yauricocha conditions, it can be used injections of thickened tailings through perforated pipes placed in the advancing front of the landfill. The injection can be prepared in clearing layers of 2.4 m of thickness on the pipe.En la mina Yauricocha se ha evaluado la factibilidad de co-disposición de relaves y desmonte para lo cual se ha estudiado las variables intervinientes como resistencias al corte y a la compresión, permeabilidad, densidad, granulometría, composición química de relaves y desmonte de mina, facilidad de lixiviación de los minerales en ambos, influencia de la aceleración sísmica en la estabilidad de taludes en desmonte y relaves. Se encontró que la mezcla más estable desde el punto de vista físico y químico es 3 de desmonte a uno de relave (3D/1R). El factor de seguridad calculado mediante el algoritmo Bishop del paquete SLIDE, está por encima de 1.1 en condiciones pseudo-estáticas. Adicionalmente se evaluó varias formas de almacenamiento conjunto desmonte-relave concluyendo que para las condiciones de Yauricocha, puede utilizarse inyección de relave espesado a través de tuberías perforadas colocadas en el frente de avance del botadero. La inyección puede efectuarse en capas de desmonte de 2.4 m de espesor sobre la tubería.Facultad de Ingeniería Geológica, Minera, Metalurgica y Geográfica2011-07-15info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionapplication/pdfhttps://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/76310.15381/iigeo.v14i27.763Revista del Instituto de Investigación de la Facultad de Ingeniería Geológica, Minera, Metalúrgica y Geográfica; Vol 14 No 27 (2011)Revista del Instituto de Investigación de la Facultad de Ingeniería Geológica, Minera, Metalúrgica y Geográfica; Vol. 14 Núm. 27 (2011)1682-30871561-0888reponame:Revista UNMSM - IIGEOinstname:Universidad Nacional Mayor de San Marcosinstacron:UNMSMspahttps://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/763/612Derechos de autor 2011 Oswaldo Ortiz S., Godelia Canchari S., Mauro Giraldo P.http://creativecommons.org/licenses/by-nc-sa/4.0info:eu-repo/semantics/openAccess2020-07-14T18:25:19Zmail@mail.com - |
| dc.title.none.fl_str_mv |
Design of joint provision of tailings and clearence in Yauricocha mine Diseño de disposición conjunta de relaves y desmonte en la mina Yauricocha |
| title |
Design of joint provision of tailings and clearence in Yauricocha mine |
| spellingShingle |
Design of joint provision of tailings and clearence in Yauricocha mine Ortiz Sánchez, Oswaldo clearence tailing clearance’s holes alkaline tailing landfill stable storage desmonte relave vacíos en desmonte relave alcalino botadero almacenaje estable |
| title_short |
Design of joint provision of tailings and clearence in Yauricocha mine |
| title_full |
Design of joint provision of tailings and clearence in Yauricocha mine |
| title_fullStr |
Design of joint provision of tailings and clearence in Yauricocha mine |
| title_full_unstemmed |
Design of joint provision of tailings and clearence in Yauricocha mine |
| title_sort |
Design of joint provision of tailings and clearence in Yauricocha mine |
| dc.creator.none.fl_str_mv |
Ortiz Sánchez, Oswaldo Canchari Silverio, Godelia Giraldo Paredez, Emiliano |
| author |
Ortiz Sánchez, Oswaldo |
| author_facet |
Ortiz Sánchez, Oswaldo Canchari Silverio, Godelia Giraldo Paredez, Emiliano |
| author_role |
author |
| author2 |
Canchari Silverio, Godelia Giraldo Paredez, Emiliano |
| author2_role |
author author |
| dc.subject.none.fl_str_mv |
clearence tailing clearance’s holes alkaline tailing landfill stable storage desmonte relave vacíos en desmonte relave alcalino botadero almacenaje estable |
| topic |
clearence tailing clearance’s holes alkaline tailing landfill stable storage desmonte relave vacíos en desmonte relave alcalino botadero almacenaje estable |
| dc.description.none.fl_txt_mv |
The feasibility of co-disposal of tailing and clearance is been evaluated in Yauricocha Mine, for which one it is been studied the involved variables such as cut and compression resistance, permeability, density, particle size, chemical composition for tailing and clearance of the mine, leaching facility of minerals in both, influence of seismic acceleration in the stability of tailing and clearance’s slopes. It was found that the most stable mixture from a physical and chemical point of view is three of clearance to one of tailing (3C/1T). The safety factor calculated by the Bishop algorithm SLIDE, is above 1.1 in pseudo-static conditions. In addition, there were evaluated more forms of joint storage for clearance-tailing, concluding that for the Yauricocha conditions, it can be used injections of thickened tailings through perforated pipes placed in the advancing front of the landfill. The injection can be prepared in clearing layers of 2.4 m of thickness on the pipe. En la mina Yauricocha se ha evaluado la factibilidad de co-disposición de relaves y desmonte para lo cual se ha estudiado las variables intervinientes como resistencias al corte y a la compresión, permeabilidad, densidad, granulometría, composición química de relaves y desmonte de mina, facilidad de lixiviación de los minerales en ambos, influencia de la aceleración sísmica en la estabilidad de taludes en desmonte y relaves. Se encontró que la mezcla más estable desde el punto de vista físico y químico es 3 de desmonte a uno de relave (3D/1R). El factor de seguridad calculado mediante el algoritmo Bishop del paquete SLIDE, está por encima de 1.1 en condiciones pseudo-estáticas. Adicionalmente se evaluó varias formas de almacenamiento conjunto desmonte-relave concluyendo que para las condiciones de Yauricocha, puede utilizarse inyección de relave espesado a través de tuberías perforadas colocadas en el frente de avance del botadero. La inyección puede efectuarse en capas de desmonte de 2.4 m de espesor sobre la tubería. |
| description |
The feasibility of co-disposal of tailing and clearance is been evaluated in Yauricocha Mine, for which one it is been studied the involved variables such as cut and compression resistance, permeability, density, particle size, chemical composition for tailing and clearance of the mine, leaching facility of minerals in both, influence of seismic acceleration in the stability of tailing and clearance’s slopes. It was found that the most stable mixture from a physical and chemical point of view is three of clearance to one of tailing (3C/1T). The safety factor calculated by the Bishop algorithm SLIDE, is above 1.1 in pseudo-static conditions. In addition, there were evaluated more forms of joint storage for clearance-tailing, concluding that for the Yauricocha conditions, it can be used injections of thickened tailings through perforated pipes placed in the advancing front of the landfill. The injection can be prepared in clearing layers of 2.4 m of thickness on the pipe. |
| publishDate |
2011 |
| dc.date.none.fl_str_mv |
2011-07-15 |
| dc.type.none.fl_str_mv |
info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
| format |
article |
| status_str |
publishedVersion |
| dc.identifier.none.fl_str_mv |
https://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/763 10.15381/iigeo.v14i27.763 |
| url |
https://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/763 |
| identifier_str_mv |
10.15381/iigeo.v14i27.763 |
| dc.language.none.fl_str_mv |
spa |
| language |
spa |
| dc.relation.none.fl_str_mv |
https://revistasinvestigacion.unmsm.edu.pe/index.php/iigeo/article/view/763/612 |
| dc.rights.none.fl_str_mv |
Derechos de autor 2011 Oswaldo Ortiz S., Godelia Canchari S., Mauro Giraldo P. http://creativecommons.org/licenses/by-nc-sa/4.0 info:eu-repo/semantics/openAccess |
| rights_invalid_str_mv |
Derechos de autor 2011 Oswaldo Ortiz S., Godelia Canchari S., Mauro Giraldo P. http://creativecommons.org/licenses/by-nc-sa/4.0 |
| eu_rights_str_mv |
openAccess |
| dc.format.none.fl_str_mv |
application/pdf |
| dc.publisher.none.fl_str_mv |
Facultad de Ingeniería Geológica, Minera, Metalurgica y Geográfica |
| publisher.none.fl_str_mv |
Facultad de Ingeniería Geológica, Minera, Metalurgica y Geográfica |
| dc.source.none.fl_str_mv |
Revista del Instituto de Investigación de la Facultad de Ingeniería Geológica, Minera, Metalúrgica y Geográfica; Vol 14 No 27 (2011) Revista del Instituto de Investigación de la Facultad de Ingeniería Geológica, Minera, Metalúrgica y Geográfica; Vol. 14 Núm. 27 (2011) 1682-3087 1561-0888 reponame:Revista UNMSM - IIGEO instname:Universidad Nacional Mayor de San Marcos instacron:UNMSM |
| reponame_str |
Revista UNMSM - IIGEO |
| collection |
Revista UNMSM - IIGEO |
| instname_str |
Universidad Nacional Mayor de San Marcos |
| instacron_str |
UNMSM |
| institution |
UNMSM |
| repository.name.fl_str_mv |
-
|
| repository.mail.fl_str_mv |
mail@mail.com |
| _version_ |
1684466179539730432 |
| score |
13.936249 |
Nota importante:
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).
La información contenida en este registro es de entera responsabilidad de la institución que gestiona el repositorio institucional donde esta contenido este documento o set de datos. El CONCYTEC no se hace responsable por los contenidos (publicaciones y/o datos) accesibles a través del Repositorio Nacional Digital de Ciencia, Tecnología e Innovación de Acceso Abierto (ALICIA).