Tamara, A., Arce, B., Arauzo, L., & Raymundo, C. (2019). Optimized pre-splitting model in controlled blasting to improve the speed of the slopes in the open pit mine in Perú.
Citación estilo ChicagoTamara, André, Bryan Arce, Luis Arauzo, y Carlos Raymundo. Optimized Pre-splitting Model in Controlled Blasting to Improve the Speed of the Slopes in the Open Pit Mine in Perú. 2019.
Cita MLATamara, André, Bryan Arce, Luis Arauzo, y Carlos Raymundo. Optimized Pre-splitting Model in Controlled Blasting to Improve the Speed of the Slopes in the Open Pit Mine in Perú. 2019.
Precaución: Estas citas no son 100% exactas.